Our teams regularly cross the border into Germany to work on special and challenging projects. For this project, they travelled to Dinslaken, where the new DINamare swimming pool a movable pool floor has been realised.
Our team has a movable 10 x 10-metre pool floor installed, equipped with a integrated staircase. The so-called dry mounting took place as early as May 2021. Due to construction delays, the wet mounting will only be implemented at a later stage.
Despite these planning challenges, the end result is exactly what we stand for: a high-quality, functional solution and a satisfied customer.
Integrated steps in the moveable pool floor
As you can see in the photos, the pool floor is equipped with a staircase that is fully integrated into the movable floor. This ensures a sleek look and optimal ease of use. The steps move automatically when the bottom is adjusted to the desired depth, making the pool flexible and safe for various target groups and activities.





related projects
-

Movable floor in hellevoetsluis (netherlands)
Swimming pool De Eendr8 in Hellevoetsluis, a modern and sustainable sports complex with several pools, movable floors and extensive facilities for young and old.
-

Two movable floors in Sint-truiden belgium
Movable pool floors in steel PP design at Sint-Truiden swimming pool, allowing several target groups to use the pools at the same time.
-

Duo movable floor, arnhem (netherlands)
Movable duo-bottom of 20 x 10 metres, recently installed by Variopool at Sports Centre Valkenhuizen.
-

Two movable floors, a vertical bulkhead and a disabled platform in winchester (england)
Variopool movable pool floor and tilting retaining wall at Winchester Sport & Leisure Park, applied for maximum flexibility, accessibility and energy efficiency.
